Product System
Standardized Skid-Mounted BWRO Systems for Global EPC Subcontracting and Industrial Projects
Standardized skid-mounted brackish water RO systems for global industrial EPC and water treatment traders. Trusted by buyers in Saudi Arabia, UAE, and Oman. SS304, PLC, >97% rejection.
Standardized Skid-Mounted BWRO Systems for Global EPC Subcontracting and Industrial Projects
For industrial EPC contractors and water treatment traders sourcing equipment for projects in the GCC region (such as Saudi Arabia, the UAE, and Oman) and globally, integrating a reliable water treatment package into the overall procurement schedule is a recurring challenge. The FG-BWRO-824 and FG-BWRO-826 skid-mounted reverse osmosis systems are designed to reduce that risk: pre-engineered, factory-assembled on an SS304 frame, and configured for straightforward integration into industrial manufacturing and food & beverage projects.
Why EPC Subcontractors and Traders Worldwide Look for Standardized Skid BWRO
In large-scale industrial projects, water treatment packages are often specified as sub-contracts. The primary pain point for EPCs is not finding a supplier who can build a custom plant — it is finding a supplier whose standard, repeatable product meets the technical specifications without triggering endless engineering review cycles.
Custom-engineered RO plants introduce schedule risk. Every non-standard design requires drawing approvals, factory acceptance test (FAT) protocol negotiations, and potential site modification. The FG-BWRO platform addresses this by offering a defined, standardized scope: 8 m³/h (FG-BWRO-824) and 12.9 m³/h (FG-BWRO-826) units built with SS304 frames and controlled by a PLC + touch screen. For a trader or an EPC subcontractor, this means a predictable footprint, known utility requirements, and a scope that can be quoted and delivered without reinventing the engineering for every project.
Technical Configuration: What is Verified and What Requires Review
The standard skid includes the RO membranes, pressure vessels, high-pressure pump, and PLC control system. However, a skid-mounted BWRO is an RO-centric package; it assumes the site provides feedwater that already meets the RO’s stringent inlet limits.
Verified Attribute | FG-BWRO-824 | FG-BWRO-826 |
Nominal permeate flow | 8 m³/h (54,800 GPD) | 12.9 m³/h (82,200 GPD) |
Membrane elements (nominal) | 8 | 12 |
Power | 5 kW (5.5 kW rated) | 11 kW (estimated)* |
Material | SS304 frame | SS304 frame |
Control | PLC + touch screen | PLC + touch screen |
Salt rejection | > 97% | > 97% |
Salt rejection is stated as >97% under the standard test conditions for the selected membrane elements. Measured rejection on site depends on feed TDS, temperature, operating pressure and recovery, and is confirmed against the project's feed-water data.
Feedwater Requirements and TDS Boundaries
To maintain the standardized warranty and performance, the feedwater must meet the following published limits:
SDI: < 3
Turbidity: < 1 NTU
Feed temperature: 5–40 °C
pH tolerance: 3–11
Iron: < 0.05 mg/L
Maximum free chlorine: 0 ppm
TDS Boundary: The product documentation positions the standard FG-BWRO skid series for TDS ≤ 2,000 mg/L as the standardized application window. For projects in the Middle East or other regions with challenging groundwater, it is critical to distinguish this from high-salinity water. TDS levels of 3,000–5,000 mg/L require project-specific engineering review; the standard skid does not represent a standardized capability for TDS ≥ 8,000 mg/L. Sourcing a standard skid for feedwater outside these limits will result in premature membrane fouling and void the performance expectations.
How the Skid Integrates into an EPC Package
For an EPC subcontractor, this skid represents a single line item in the water treatment package. The scope boundaries for RFQ alignment are separated as follows:
Scope Layer | Verified Integrated Scope | Project-Specific Confirmation Needed |
RO Skid | SS304 frame, pressure vessels, pump, PLC, RO membranes | Membrane brand/model, exact element count per feed TDS |
Pretreatment | Not included in base skid | Whether site feed requires softening, media filtration, or antiscalant dosing |
Post-treatment | Not included in base skid | Whether UV/ozone or remineralization is required for final product water |
Instrumentation | PLC + touch screen | Whether client SCADA requires RS485/Modbus or specific inline sensors |
Enclosure | Open-frame skid | Whether an acoustic enclosure or containerized execution is required |
Localized Sourcing Context: Saudi Arabia, UAE, and Oman
When sourcing a standard BWRO supplier for Saudi Arabia or neighboring GCC markets, logistics and documentation are as important as the equipment itself. EPCs require suppliers who understand the import requirements and can provide the necessary documentation (e.g., machinery test reports, video outgoing inspection) for customs clearance and site handover.
Standard Documentation and Project-Support Scope
· General arrangement / outline drawing, P&ID and utility-and-connection requirements for interface coordination.
· Machinery test report and video outgoing inspection, as part of the standard factory-tested scope.
· Packing and shipping list and commercial documentation needed for import customs clearance and site handover.
· Installation and commissioning instructions; detailed FAT protocols, SAT criteria and third-party inspection are agreed during the procurement phase.
Scope of Regional Claims — Read Carefully
References to Saudi Arabia, the UAE, Oman and other markets describe the project regions these standardised systems are supplied into (export supply), not a claim of local manufacturing, in-country service centres, regional warehousing, or established local project references.
· Delivery lead times are subject to the confirmed project scope and shipping arrangement; no fixed guarantee is implied on this page.
· The service model (remote support versus on-site attendance) is defined in the contract and should not be assumed beyond that scope.
· Market-trust statements should be supported by customer-authorised references where they are made; none is asserted as verified here.
FAQ: What EPCs and Traders Ask Before Sourcing
Q1: Can this standard skid be used for a 10 m³/h EPC package?
Yes, but you must select between the 824 (8 m³/h) and 826 (12.9 m³/h) models. The correct selection depends on whether the EPC specification allows for a buffer tank to handle peak flows, or if the RO must continuously match a 10 m³/h demand.
Q2: What happens if the site's well water TDS is 4,000 mg/L?
The standard promotion scope for the FG-BWRO skid is TDS ≤ 2,000 mg/L. If the site's TDS is 4,000 mg/L, the project must be escalated for engineering review. Higher TDS requires different membrane arrays, higher operating pressures, and potentially different pump materials. Do not order the standard skid for 4,000 mg/L feedwater without written engineering approval.
Q3: Is the pretreatment included?
No. The standard skid is the RO core. If the feedwater has high hardness, iron, or chlorine, the EPC must include a separate pretreatment step (such as multimedia filtration, softening, or activated carbon) upstream of the skid. Optional pretreatment integration is available but must be specified.
Q4: What FAT documentation is provided?
The standard scope includes a machinery test report and video outgoing inspection. For EPC projects, specific FAT protocols (e.g., third-party inspection, specific hydro-testing) must be agreed upon during the procurement phase.
Q5: Can FG Water support traders with OEM or neutral branding?
This is a commercial arrangement that must be discussed with FG Water's sales team. The product documentation describes FG Water branded equipment; OEM terms are not stated as standard scope on this page.
Inquiry CTA
For EPC subcontractors and water treatment traders worldwide: send your project specifications, feedwater analysis (TDS, SDI, turbidity), and required daily volume to our industrial team. We will confirm if the FG-BWRO-824 or 826 fits your sub-contract scope, or if a custom engineering review is required.
Email: mailto:[email protected]
View Full Specifications: https://www.fgwater.com/product-system/831.html
View Containerized UF+RO (Alternative): https://www.fgwater.com/product-system/827.html
Send Your Water Treatment Requirement
Tell us the feedwater, required capacity, target water quality and project conditions. Your inquiry email will automatically include the page you are viewing so our team can understand the exact product, technology or reference that led to your request.
- Feedwater source / available analysis
- Design flow or required production capacity
- Target product-water quality or process duty
- Project country, operating conditions and delivery target
